Apparently, I am not able to upload attachements from my iPhone. Minutes, care of Leslie Rash, are as follows:

2001 Bering Drive Association, Inc

Annual Meeting

February 16. 2011

Board Members in attendance

Leslie Rash –Minutes

Pat Leith

Adam Guerra

Omah Williams


Others in attendance

Tish McCracken- KRJ

Adolpho Carillo-High Strength Contracting


Quorum achieved

Meeting called to order

Proxies certified

Introduction of Board Members

Waved reading of 2010 annual meeting minutes

Election of BOD ballots distributed (Omah reelected)

Old business –none

New business

Items brought up by attendees

-Landscaping-frozen plants will be replaced around March to make sure there are no more freezes

-Home owner requested to move a rat traps

-Home owner doesn't feel that her requests are being attended to. Would like to start a communication tool to keep home owners informed. Omah will start a blog. She will make all board members administrators. 2001beringdrive.blogspot.com

-Pedestrian gates not working. Adolfo stated that new key pads have been ordered

-New gates-motors on both gates have been replaced

-Suggestion was made to change gate code

-Concerns about gates being locked when electricity is out. There is a crank on the motor of the gate box. Box can be opened and does not lock

-Suggestion to put paper recycle bin in front of mail boxes. Robert Hyatt 14 G will look into getting a bin.

-Concern about standing water-Adolfo addressed new parking lot and drainage.

-Foundation problem with G unit. Tish says that it has been corrected. New irrigation systems should help with the foundation shifting but it will continue to move.

-Suggestion of adding more cameras-very expensive.

-Million dollars in loans one is five years and one in seven years.

-New pool furniture will be ordered.

-Benches will be installed in front of property

-Transformer buried by G building; Center Point has been called.

-Parking head in is not allowed in entire lot. Parking rules not currently being enforced because of construction

Adolpho w/ High Strength Contracting

-Storage area behind first dumpster has been removed. Items inside are sitting outside.

-Three tandem parking spaces at back of lot will be eliminated

-He will be getting the lock on the pool gate fixed

-Fire extinguishers are being stolen. More have been ordered.

Adjourn


~Omah

4 comments:

  1. Thank you for posting minutes.

    ReplyDelete
  2. Omah,
    Thank you, the email you wrote on the list last night was "undeliverable", please confirm your email for the distribution list.
    Robert
    robert.ragincajun@gmail.com

    ReplyDelete
  3. Omah,

    Thank you for the update!! Tha property looks the best it has looked in years.

    Cheers,
    Lee

    Lee Leverett
    Recruiter
    Engineering, Subsea and Flow Assurance
    www.srxgroup.com
    ll@srxgroup.com
    832-266-1554 Office
    832-603-4008 Fax
    832-894-7625 Cell
    leeleverett2001 Skype

    ReplyDelete
  4. The mins are missing two items that I can recall:

    1. Foundation for building C needs to be checked, Tish is to work with the foundation company.
    2. The Unit numbers placed on the doors are backward - they read as letter then number as opposed to number then letter, Tish is to follow-up with the company to have them re-order the signs to read correctly.